The new facility at SDSU is 82'2" tall -- outside.  Inside, the clear height at midfield is 61'8".  The SDSU facility does not have a curved roof like UND...the SDSU facility (the field / running track are east/west) slopes from 82'2" on the south down to 70'6" on the south.  When the UND facility is completed, 60 feet will look plenty high. I suppose the scale of the UND building may make the roof seem closer compared to the SDSU facility but UND's facility will be 30,000 sq feet larger than SDSU's.  I've been in the SDSU facility a number of times and I can't imagine how big the UND facility is going to be.

 

Did I read correctly that UND is getting that building done for a little more than $13 million?  If so, that's a bargain.

Posted

The new facility at SDSU is 82'2" tall -- outside.  Inside, the clear height at midfield is 61'8".  The SDSU facility does not have a curved roof like UND...the SDSU facility (the field / running track are east/west) slopes from 82'2" on the south down to 70'6" on the south.  When the UND facility is completed, 60 feet will look plenty high. I suppose the scale of the UND building may make the roof seem closer compared to the SDSU facility but UND's facility will be 30,000 sq feet larger than SDSU's.  I've been in the SDSU facility a number of times and I can't imagine how big the UND facility is going to be.

 

Did I read correctly that UND is getting that building done for a little more than $13 million?  If so, that's a bargain.

There will be a second phase with locker rooms and coaches offices, etc...  I think the total will end up around 30m

Posted

But they now moving some things back to Phase 2 as the cost of construction and construction materials are increasing rather rapidly. This is why I had hoped those of us on SS.com would help fund something originally scheduled for Phase 1 that is being pushed back due to lack of funds.

Posted

But they now moving some things back to Phase 2 as the cost of construction and construction materials are increasing rather rapidly. This is why I had hoped those of us on SS.com would help fund something originally scheduled for Phase 1 that is being pushed back due to lack of funds.

Oh cripes, that is the last thing we need right now. :sad:

Posted

But they now moving some things back to Phase 2 as the cost of construction and construction materials are increasing rather rapidly. This is why I had hoped those of us on SS.com would help fund something originally scheduled for Phase 1 that is being pushed back due to lack of funds.

Recently? Or before construction started? Isn't that what contracts are for.

The longer you wait for phase 2 the higher the construction costs.

Posted

I just drove by today.  I would say the roof is 60-65% on.  The North endwall is on and both sidewalls are about 50%.  Looks like they made good progress the last week or so with the mild weather.

Posted

Consistency with Campus Facility Master Plan and Budget: This project has been developed as part of a detailed athletics master plan undertaken in 2005 in response to the transition to NCAA Division 1 competition. An indoor practice facility was identified in this plan as one of the most critical needs for a successful transition to that division. It is a crucial element for the recruitment of student athletes and their subsequent success in both academic and athletic endeavors. The plan fully integrates with the campus master plan submitted to the SBHE in 2008 and remains fully consistent at this time. 

 

 

 

Hmm

  • 2 weeks later...
Posted

I know that priorities and needs were different, but I drove by NDSU's campus today and after seeing their bubble, I could not be more happy with the decision to build a permanent IPF.

  • Upvote 1
  • 3 weeks later...
Posted

That picture does not do the massive size of that place justice.

 

That's 300,000 square feet.

 

For comparison, The Ralph, Alerus Center, and FargoDome range from 400,000 to 500,000 square feet. 

  • 2 weeks later...
  • 3 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...