Has anyone been by there recently?  They must have made some significant progress by now I would assume. 

 

 

They have about 13-14 of the roof trusses up as well as the roof over it last time I rolled over the Colombia overpass to check.  Mabe more by now.  Really starting to take shape.  I think I heard Faison say in an interview that they are really pushing to get the the roof up before the snow flies so they can do a lot of the work inside over the winter.

Posted

They have about 13-14 of the roof trusses up ... 

 

They must've had a good couple of days. I swear Sunday (on way to see the Bisons) was more like seven or eight. 

 

There are photos in the 2014 season thread. 

Posted

They must've had a good couple of days. I swear Sunday (on way to see the Bisons) was more like seven or eight. 

 

There are photos in the 2014 season thread. 

 

You're probably right.  For some reason I thought they were closer together.  Either way it's progressing nicely.

Posted

80 yards? Cost cutting?

 

Shouldn't be cost cutting.  They brag on twitter constantly about how it's the "largest IPF in the country" or something like that.  

 

At least for the next three months.   :bigsmile:

 

P.S. - they I didn't see a turf area for the lineman to work like UND will have.  

  • Upvote 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...